ADU Rules in San Bernardino, California

Complete guide to building an Accessory Dwelling Unit in San Bernardino — zoning, setbacks, permits, costs, and more.

Max Size: 1200 sq ft; reduces to 800 sq ft if lot coverage exceeded Setbacks: 4 ft minimum (detached new construction) No Parking Required Verified: 2026-03-15
ADU Score: 8/10

San Bernardino County is very ADU-friendly with no parking requirements and a 60-day approval mandate. Both County and City paths available. Favorable zoning in most residential areas with low restrictions.

Zoning & Size Requirements [1]

Allowed ZonesMost residential zones (R-1, R-2, R-3, multifamily)
Max Size (Detached)1200 sq ft; reduces to 800 sq ft if lot coverage exceeded
Max Size (Attached)1200 sq ft or 50% of primary dwelling, whichever is less
Max Size (JADU)500 sq ft
Max Height16 ft minimum; up to 25 ft with exceptions
Max Units1 ADU + 1 JADU per single-family lot; 2 ADUs on multifamily

Setback Requirements [1]

Rear Setback4 ft minimum (detached new construction)
Side Setback4 ft minimum (interior side, detached new construction)
Front SetbackBase zone compliance
Parking RequiredNo additional parking required (conversions/existing exempt)
Owner OccupancyNot required under state law
Min Lot SizeNo specific state minimum

Permit Process & Fees [2]

Approval ProcessCounty ADU Handout provides detailed requirements. Submit to San Bernardino County Land Use Services.
Review Timeline60 days mandatory for approval/denial of complete applications with existing dwelling
Permit Fees$3,000-$12,000 estimated (varies by jurisdiction within County)
Impact FeesWaived under 750 sq ft (SB 13); proportional for larger units
Plan CheckIncluded in permit timeline; County must respond within 60 days
Pre-Approved PlansCounty has standard ADU plans available

Get Free ADU Quotes in San Bernardino

Connect with pre-vetted ADU contractors in your area. Free, no obligation.

🔒 Your info is secure. We connect you with up to 3 vetted local contractors. No spam, no obligation.

Construction Costs

Average Build Cost$160,000-$280,000
Cost per Sq Ft$200-$260
Garage Conversion$75,000-$140,000
Prefab ADU (Installed)$80,000-$150,000

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Rental Income Potential

Avg Rent (1 Bedroom)$1,300-$1,700
Avg Rent (2 Bedroom)$1,700-$2,100
Short-Term RentalSubject to city/county ordinances; verify before planning
Est. Annual ROI7-10 year payback

Explore Prefab ADU Options

Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Recent Law Changes

What's Changed Recently

  • SB 13 impact fee waivers for <750 sq ft units
  • County mandates 60-day approval timeline
  • ADU Handout (updated) clarifies regulations
  • CALHFA $40,000 ADU grant funds available for County residents

Tips for Building an ADU in San Bernardino

  • County is very supportive of ADU development
  • 60-day approval timeline is legally mandated
  • Check if property qualifies for CALHFA $40,000 grant
  • No parking requirements reduce construction costs
  • Contact County Land Use Services for specific property questions

Sources & References

All data on this page is sourced from official government records and verified market data. View our full methodology.

  1. San Bernardino Planning Department — ADU Information Planning Department — Accessed 2026-03-15
  2. San Bernardino Building Department — Permit Information building_dept — Accessed 2026-03-15

Frequently Asked Questions

Can I build an ADU in San Bernardino?

Yes. ADUs are allowed in Most residential zones (R-1, R-2, R-3, multifamily) in San Bernardino. The maximum size for a detached ADU is 1200 sq ft; reduces to 800 sq ft if lot coverage exceeded. No owner-occupancy is required.

How much does an ADU cost in San Bernardino?

ADU construction in San Bernardino typically costs $160,000-$280,000. Garage conversions run $75,000-$140,000, and prefab ADUs cost $80,000-$150,000.

How much can I rent an ADU for in San Bernardino?

Average ADU rents in San Bernardino are $1,300-$1,700 for a 1-bedroom and $1,700-$2,100 for a 2-bedroom unit.

Do I need parking for an ADU in San Bernardino?

No additional parking required (conversions/existing exempt). Check with San Bernardino planning department for the latest California ADU parking rules, as many states have relaxed requirements in recent years.

How long does it take to get an ADU permit in San Bernardino?

The permit review timeline in San Bernardino is 60 days mandatory for approval/denial of complete applications with existing dwelling. Fees range from $3,000-$12,000 estimated (varies by jurisdiction within County).

Ready to Build in San Bernardino?

Get free, no-obligation quotes from top-rated ADU contractors in San Bernardino.

Get Free Quotes →

ADU Guides for San Bernardino Homeowners

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Join 5,000+ homeowners and investors.